Trenching and excavation work presents serious hazards to all workers involved. Cave-ins pose the greatest risk and are more and backfilling jobs an employer has done in the past, it is important to approach each new job with care and preparation. Many on-the-job incidents water content of soil, weather and climate, and other operations .
Learn MoreJan 22, 2014 · 5.3 Backfilling work. 5.3.1 After completion of the compaction under blinding, tie beams and ground slab. Backfilling shall commence using similar excavated material. Care shall be taken to remove bolder, vegetations and any other deleterious materials. 5.3.2 But prior to backfilling, the compacted surface shall be accepted by the Engineer.
Learn MoreNov 13, 2021 · 18. Backfilling area is clean from any foreign dust, boulders, wood, etc. 19. The loose soil layer is a maximum of 200mm. 20. Compacted layer is 150mm maximum. 21. Feild density Test at each layer. 22. Test report review. Conclusion. The above said Excavation and Backfilling work procedure shall vary as per project location and specification.
Learn MoreHOW TO DO OF SHEET PILE WORK FOR DEEP PIT. Sheet piling is an earth retention and excavation support technique that retains soil, using steel sheet pile sections with interlocking edges. Sheet piles are installed in sequence to design depth along the planned excavation perimeter. PERIMETER PLAN and SECTION ( SKETCH )
Learn More5.0 PROCEDURES Unless otherwise specified in the FSP, a test pit (hand-dug) or trench (machine-dug) will consist of an excavation dug through soil, mine soil, rock pile, and/or buried material. Important: Personnel will not enter a test pit/trench until authorized by the Safety Officer.
Learn MoreMarch 14th, 2010 - Read More Excavation and Backfilling of Soil – Work Sequence and Procedure SHARE Facebook Twitter About Gopal Mishra Gopal Mishra is a Civil Engineer from NIT Calicut and has more than 9 years of experience in Civil Engineering and Construction He is the founder of The Constructor Excavation Backfill amp Compaction within the
Learn MoreSep 06, 2011 · All the inspections during field survey, Site preparation, Setting out, Excavation, Backfilling and Compaction shall be as per inspection and test plan (ITP) for earth work 6.1.5 All the inspections shall be done as per the notification for inspection (NFI)
Learn MoreFoundation Work. Erosion Control. Another important part of the construction process is backfilling. This begins right after the. excavation process when the soil is compressed back into the trench. This supports roadways, foundations, walkways, and other structures related to using a mixture of soil. The process of backfilling is putting the
Learn Moreexcavation, hazard control and elimination, PPE being utilized, soil classification, atmospheric testing when required, acceptance of responsibility and authorization and the excavation inspection
Learn MoreNov 13, 2021 · 18. Backfilling area is clean from any foreign dust, boulders, wood, etc. 19. The loose soil layer is a maximum of 200mm. 20. Compacted layer is 150mm maximum. 21. Feild density Test at each layer. 22. Test report review. Conclusion. The above said Excavation and Backfilling work procedure shall vary as per project location and specification.
Learn MoreProceed promptly with backfilling work, area to be backfilled has been inspected and approved by consulting engineer. Place backfill in 200mm thick maximum layers. Compact each layer before placing next layer. Maintain optimum moisture content to achieve required densities.
Learn MoreExcavation and Backfilling of Soil - Work Sequence and
Learn Moreperforming, and closing out excavations in which contact with soil is expected – such as trenching, drilling, removing, or penetrating soil – that meet any of these conditions at any time: 1. Depth is one foot or more 2. Power tools will be used 3. Utilities are identified 4. Soil will be disturbed as a result of asphalt and/or concrete
Learn MoreFeb 12, 2021 · Excavation & Backfilling. Preparations and Preconditions. Permit to Work (PTW) shall be raised for the excavation clearly mentioning the location of work, size of excavation and levels. Excavations area shall be surveyed and marked to the lines and levels as shown on the drawings.
Learn MoreMar 30, 2020 · Backfilling Meaning | Backfilling Procedure & Importance of Backfilling What is Backfilling / Backfilling Meaning Backfilling is the process of replacing or reusing the soil that is removed during excavation construction to strengthen and support a structure's foundation. Typically, backfilling in the foundation is the process of putting back the soil in the foundation trench.
Learn MoreExcavation, Backfill & Compaction within the Swamp Area 9 of16 My Documents/ à ¦ µ¦ nµ Ç/J.1953/ µ ° ª¸«´ ·Í/Method Statements/Swamp 4.5.2 Excavation, Backfill and Compaction Procedure Considering the present condition of the site there is the public canal located approximately 5 meters eastside from the Phenol boundary.
Learn MoreExcavation and Backfilling of Soil - Work Sequence and . understanding of such procedures as excavating, backfilling, pipefitting and electrical work. No amount of written instruction by a manufacturer or a regulatory agency will convert an inexperienced, under supervised laborer into a skilled, experienced mechanic.
Learn MoreMar 30, 2021 · In case of loose soil, sides of the excavation shall be suitably sloped to avoid collapse. Arrangement of shoring/strutting, dewatering to be ensured. Excavated earth shall be disposed off to designated locations.Some quantity of excavated earth shall be retained for backfilling if directed.
Learn MoreExcavation and Backfill Method Statement. This method statement describes the procedure and inspection instructions to be followed during the Excavation and Backfill for all kind of related works. Document will ensure that all activities are in full compliance with project specifications.
Learn MoreMethod Statement for Backfilling and Compaction Procedure